NSP to mayur vihar phase 1: Pink Line or Line 7 was the first line to be inaugurated as part of Delhi Metro Stage III development. At 58.5 kilometres, it is the longest line on the system; nonetheless, the whole line is not yet functional. The viaduct between Trilokpuri– Sanjay Lake and Mayur Vihar Pocket 1 has not been built, so the line works as two different sections– Shiv Vihar to Trilokpuri– Sanjay Lake and Majlis Park to Mayur Vihar Pocket 1– with an overall of 38 stations.
Contents
Quick Info
- Inaugurated in: 14 March 2018
- Variety of Terminals: 38 Terminals and 10 Interchanges
- Timings: 6:00 am to 11:30 pm
- Ticket Price: Rs.10 to Rs.60.
- Places to Remain: Hotels In Delh.
Pink Line Interesting Details.
The Pink Line of the Delhi Metro was inaugurated in phases. The very first area, in between Majlis Park and Durgabai Deshmukh South University, was opened to the general public on March 14, 2018. Ultimately, extra areas were opened in different phases, with the final stretch coming to be functional on August 6, 2018.
The Pink Line is roughly 58.6 kilometers (36.4 miles) long, making it one of the longest lines in the Delhi Metro network.
The line has six-coach trains that go for a maximum speed of 80 km/h on 1435 mm (typical gauge) tracks and 25 kV air conditioner through overhanging cords. Pink Line goes through the city in a circle, mostly along the Internal Ring Road.
It is just one of the only 3 lines on the system to have system screen doors in any way terminals, communication-based train control (CBTC) innovation in addition to centers for driverless train procedure.
Read More: NSP Pre Matric Scholarship 2023-24, Last Day, Apply Online IND News Update
Additional Extension of Pink Line.
Under Stage IV, Pink Line is to be extended from Maujpur– Babarpur to Majlis Park. This way, those that need to commute in between both stations, will not need to take a trip on the entire line and Delhi in a virtual circle; they can simply take the train throughout the Yamuna River to reach their destination.
Frequently Asked Questions On nsp to mayur vihar phase 1
A. Currently, the Pink Line Delhi Metro is running on 38 terminals with 10 interchanges.
A. Majlis Park and Shiv Vihar are the preliminary terminals on the Pink Line on both ends.
A. Some of the most prominent terminals on the Pink Line are Hazrat Nizamuddin, Welcome, INA, Sarojini Nagar, Netaji Subhash Place, and Rajouri Garden.
A. Delhi City Rail Company (DMRC) operates all the procedures of Delhi Metro.
A. The Delhi Metro has actually made substantial efforts to maintain sanitation by applying normal cleansing schedules, and waste administration systems, and educating passengers concerning maintaining cleanliness inside the trains and stations.
A. The Pink Line is the longest with 59 kilometres and 38 stations.
A. The 23 kilometers-long Airport Express Line or the Orange Line is the fastest Metro connection in India providing smooth connection from the New Delhi Train Terminal to Dwarka Industry 21 via IGI Airport -3 and Aerocity.
A. The shortest line in Delhi Metro is the Grey Line with a distance of 5.19 kilometres with 4 stations.
A. The initial train separation time on the Pink Line of the Delhi Metro is 6:00 am.
A. The last train separation time on the Pink Line of the Delhi City is 11:30 pm.